ERTIX work order management creates, tracks and executes aircraft maintenance work orders — connecting each work order to its maintenance case, material requirements, execution status, result evidence and verification within one MRO system.
Each work order moves through a clear lifecycle — from draft to ready, in progress, completed, verification required, and closed — with each transition recorded in the case history for full maintenance traceability.
When a work order requires parts, the material requirement connects to inventory and procurement inside the same workflow. Procurement is a step inside the maintenance lifecycle — not a separate supply-chain tool.
Compatible work orders can be grouped into work packages for planning and execution. Work package lifecycle — planning, ready, in execution, awaiting verification, completed — is planner-controlled and recorded in history.